This lifter was developed to solve the problem of rigging a GE Power Assembly from the shipping position - (laying on the exhaust port side) to the 22 1/2 degree engine installation position. A 112 1/2 degree trolley is incorporated, allowing an operator easy repositioning of the power assembly. (See Photos)